Gassco AS – Consent to Use the Nybro Connection to Europipe II

Source: www.gulfoilandgas.com 1/24/2022, Location: Europe

The Petroleum Safety Authority Norway (PSA) has given Gassco consent to use the Nybro connection to Europipe II.

The Europipe II Branch pipeline will be connected using a Pipeline End Manifold (PLEM) and two crossover spools to the existing subsea T-link (Nybro Tee) on Europipe II.


United Kingdom >>  6/16/2022 - A consortium of Aker Solutions, Siemens Energy and Doosan Babcock has been awarded the front-end engineering and design (FEED) contract for SSE Therma...
United Kingdom >>  6/13/2022 - Anasuria Operating Company has granted Petrofac, a prominent provider of services to the global petroleum business, an Integrated Services Provider (I...

Norway >>  6/1/2022 - Aker Solutions has secured a significant[1] three-year contract extension to an existing framework agreement for work at North Sea fields operated by ...




Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.