Tamboran Announces Upgrade to Tanumbirini 2H and 3H Flow Test Results

Source: www.gulfoilandgas.com 3/21/2022, Location: Not categorized

Highlights

- Santos, the operator of EP 161 permit within the Beetaloo Sub-basin, has advised of an approx. 17% increase to the previously reported gas flow rates from Tanumbirini 2H ('T2H') and 3H ('T3H').

- This follows a recalibration of the historic flow data as reported on 1 February 2022, which now indicate the average gas flow rates from T2H and T3H were 2.0 million standard cubic feet per day ('mmscfd') (normalised at 3.0 mmscfd over 1,000-metres) and 1.7 mmscfd (normalised at 2.9 mmscfd over 1,000-metres) respectively.

- Further market updates on T2H and T3H are anticipated following the installation of tubing during the second quarter of calendar year 2022.

Tamboran Resources Managing Director and CEO, Joel Riddle, said:

'During the course of flow testing, the T2H and T3H wells representative gas samples from the Velkerri “B” shale interval were acquired. Compositional analysis was completed on these samples confirming the presence of high-quality gas in both wells. Well test gas rates have been updated based on these analyses.

'The revised flow rate data has resulted in an approximately 17 per cent increase to the 14-day average gas flow rate for the T2H well to 3.0 mmscfd and in the ten-day average gas flow rate for the T3H well to 2.9 mmscfd, normalised over a 1,000-metre horizontal section.

'The T2H well has continued to undergo flow testing during March 2022, with the 60-day average flow rate showing minimal decline, delivering 1.8 mmscfd over the stimulated 660-metre lateral section, normalised at 2.7 mmscfd over 1,000-metres.

'Flow testing at this rate from the fracture stimulation program gives us increased confidence in the productivity and has not changed our understanding of the commerciality of the Mid-Velkerri “B” shale within the Beetaloo Sub-basin of the Northern Territory.

'The T3H well was shut-in during mid-February 2022 to record surface pressure build-up data and to run a production tubing string to optimise well performance. The operator is assessing the potential to run production tubing in the T2H well in the second quarter of calendar year 2022.'


Philippines >>  3/23/2023 - PETRONAS and Phoenix Petroleum have signed a Memorandum of Understanding (MOU) to jointly explore a partnership opportunity in the Philippines in the ...
Norway >>  3/21/2023 -  Longboat Energy, the full cycle emerging E&P business, announces its full-year results for the period ended 31 December 2022.

High...


Mexico >>  3/17/2023 - Eni announces a new discovery on the Yatzil exploration prospect in Block 7, located in the mid-deep water of the Cuenca Salina in the Sureste Basin, ...
Namibia >>  3/16/2023 - Global is pleased to announce its interim results for the six months ended 31 December 2022.

Operational
· Recent purchas...


Australia >>  3/15/2023 - Perth Basin energy company Norwest Energy has advised that the Lockyer-2 gas appraisal well was spudded on 15 March 2023.

Lockyer-2 is a do...

Oman >>  3/15/2023 - Tethys Oil reports that the fiscal metering equipment for the extended well test on Al Jumd has arrived at the hook up point, and installation is ongo...




Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.