Vestas Secures 201 MW Order of EnVentus Turbines in the USA

Source: www.gulfoilandgas.com 3/31/2022, Location: North America

Vestas has received a 201 MW order to power an undisclosed wind project in the USA. The order consists of 33 V162-6.2 MW wind turbines in 6.0 MW operating mode and one V136-3.45 MW turbine.

The order includes supply, delivery, and commissioning of the turbines, as well as a 15-year Active Output Management 5000 (AOM 5000) service agreement, designed to ensure optimised performance of the asset.

Turbine delivery begins in the fourth quarter of 2022 with commissioning scheduled for the fourth quarter of 2023.


France >>  8/9/2022 - As the installation of the wind turbines on the Saint-Nazaire offshore wind farm is underway, Louis Dreyfus Armateurs and Tidal TransitLimited are ple...
Canada >>  8/3/2022 - Capstone Green Energy Corporation (CGRN) secured a follow-on order for two C200S high-pressure natural gas microturbine systems. The customer is a Can...

United Kingdom >>  8/2/2022 - Dagang NeXchange Berhad (“DNeX”), via its subsidiary Ping Petroleum UK PLC (“Ping”), has signed a Memorandum of Understanding (“MoU”) with Cerulean Wi...
Malaysia >>  8/1/2022 - Capstone Green Energy Corporation's distributor in Malaysia and Brunei, Sekito, has secured an order for a 200 kW microturbine-based system for an oil...

Russia >>  7/29/2022 - Concrete was poured for the first wind turbine foundation at the Trunovskaya Wind Farm in the Stavropol Krai (Southern Russia).
<...

China >>  7/21/2022 - Representatives from Van Oord, DNV, and CIMC Raffles attended the commencement ceremony for the Van Oord JUV BOREAS, a wind turbine installation vesse...




Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.