Aker BP Load-Bearing Structures and Maritime Systems

Source: www.gulfoilandgas.com 5/3/2022, Location: Europe

The Petroleum Safety Authority Norway (PSA) has carried out an audit of Aker BPs follow-up of load-bearing structures and maritime systems for the facilities at Valhall, Ula, Ivar Aasen, Alvheim, Skarv, Tambar and Hod. The audit was conducted on 23-24 February 2022.

Objective
The objective of the audit was to verify that the integrity of structures and maritime systems is safeguarded in accordance with the requirements of the HSE regulations.

Result
One non-conformity concerning safety of a main load-bearing structural element was identified.

An improvement point was also identified concerning monitoring of the technical condition of grout compounds.

What happens next?
We have asked Aker BP to report by 6 May 2022 on how the non-conformity will be addressed and for their assessment of the improvement point observed.


United Kingdom >>  6/16/2022 - A consortium of Aker Solutions, Siemens Energy and Doosan Babcock has been awarded the front-end engineering and design (FEED) contract for SSE Therma...
United Kingdom >>  6/13/2022 - Anasuria Operating Company has granted Petrofac, a prominent provider of services to the global petroleum business, an Integrated Services Provider (I...

Norway >>  6/1/2022 - Aker Solutions has secured a significant[1] three-year contract extension to an existing framework agreement for work at North Sea fields operated by ...




Gulf Oil and Gas
Copyright 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.