"The measures to increase production of old wells in Huaqing Oilfield are based on the needs of the reservoir, adhere to advanced planning, comprehensively apply the "six maps and three lines", through careful layer selection and well selection, continue to optimize the measure process, the measure effect The benefits continue to improve." On May 5, Li Libiao, director of the Oil Production Technology Research Institute of the No. 1 Oil Production Plant of Changqing Oilfield, said. Since the beginning of the year, the No. 10 Oil Production Plant has kept a close eye on the target of oil well measures, established a key work group for measures, clarified the division of responsibilities, strengthened communication and coordination, organized 3 well selection seminars, and selected 201 wells.
This plant adheres to the principle of "doing early, doing well, and doing less", in accordance with the idea of ??"sequential implementation-tracking analysis-optimization and adjustment-summarization and improvement", combined with well selection, layer selection, and on-site implementation, monthly analysis of measures is carried out to optimize and adjust Measures, techniques and directions, through the method of "video surveillance + on-site inspection + side station supervision", to carry out on-site supervision and assistance, technical personnel provide technical support for key processes, analyze and solve problems in a timely manner, and strive to improve construction quality and progress.
Up to now, Changqing Oil Production No. 10 has completed the production increase measures of 115 oil wells this year, accumulatively increasing oil by 6,603 tons, an increase of 1,220 tons over the same period last year.