Equinor Sleipner A and B Management of Emergency Preparedness & Helidecks

Source: www.gulfoilandgas.com 6/2/2022, Location: Europe

The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor and its management of emergency preparedness and helidecks at Sleipner A and B. The audit was conducted from 9 to 11 April 2022 with assistance from the Civil Aviation Authority Norway.

Objective
The objective of the audit was to verify processes and systems that contribute to ensuring the comprehensive management of emergency preparedness, and to verify that helidecks comply with regulatory requirements in order to help ensure safe helicopter operations and personnel transport.

Result
The Civil Aviation Authority Norway identified 12 helideck-related non-conformities.

What happens next?
We have asked Equinor to report by 24 June 2022 on how the non-conformities will be addressed and for their assessment of the observations made.


Norway >>  8/11/2022 - Aker Solutions has been awarded a sizeable [1] contract from Aker BP to provide the subsea production system for the Trell & Trine field development, ...
Norway >>  8/11/2022 - Subsea 7 announced the award of a sizeable1 contract by Aker BP for the Trell & Trine field development, located in the Alvheim area of the North Sea....

United Kingdom >>  8/2/2022 - Aker Solutions has been awarded a contract(1) from Shell UK for the delivery of a not permanently attended installation (NPAI) for the Jackdaw gas fie...
Netherlands/Holland >>  7/21/2022 - As part of the current Partnership Agreement between Technip Energies and Neste, Technip Energies (TE) has been awarded a large contract by Neste for ...




Gulf Oil and Gas
Copyright 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.