the second-phase reconstruction and expansion project of the combined heat and power generation in Muling City, Heilongjiang Province, which was constructed by the EPC general contract of China Energy Construction Longjiang Energy Construction, started.
The project is located on the north side of the urban area of ??Bamiantong Town, Muling City, Heilongjiang Province. The main construction content is to expand 2*150 tons/hour steam boiler + 2*25 MW back pressure steam turbine generator set and ancillary facilities. The construction land is about 90,001 square meters, and the construction period is planned to be completed in September 2024.
The project is one of the top 100 projects of the Heilongjiang provincial government, and it is also a livelihood project for Muling citizens. After the completion of the project, it will completely change the current situation of the local urban heating system, realize the replacement of cogeneration, effectively expand the area of ??urban centralized heating, and greatly improve the quality of urban heating. consumption is important.