Weekly Drilling Report May 18, 2023

Source: www.gulfoilandgas.com 5/19/2023, Location: Europe

WELL: Bayhanli-2

Progress: 259 meters
Measured Depth: 3425 metres

Week Summary:
Drill out and drill new 8 ½” hole to 3425 metres
Run in 7” casing and cement
Run in with scraper, bristle brush and Magnostar assemblage

Further Activities:
Clean and scrap 7” casing
Run in with tubing and packer
Perforate, test and turn over to production department

This well had about 44 metres of gas pay. The lower E sand had about 14 metres and will most likely be the first zone to perforate and put on production. Mid next week the well should be perforated and tested.


Norway >>  9/22/2023 - The Norwegian Petroleum Directorate (NPD) has granted Wintershall Dea Norge AS drilling permit for well 6406/3-12 S in production licence 836 S, cf. S...
Zimbabwe >>  9/21/2023 - HIGHLIGHTS
• Drilling commenced at Mukuyu-2 marking an important milestone in the high impact Cabora Bassa Basin exploration program
• Rig...


Australia >>  9/18/2023 - Falcon Oil & Gas Ltd. (FO, FOG) is pleased to announce that drilling operations on the Shenandoah South 1H (“SS1H”) well have been successfully comple...
Canada >>  9/12/2023 - Prospera has completed the drilling of four horizontal wells of the ten well multi-pad infill drill program. These wells encountered structure and pay...

Canada >>  9/12/2023 - Helium Evolution Incorporated (TSXV:HEVI) ("HEVI" or the "Company"), a Canadian-based helium exploration company focused on developing assets in south...
Botswana >>  9/11/2023 - - Lateral wells of the Lesedi 4 production pod have been successfully redrilled
- Drilling of Lesedi 6 production pod was completed earlier
...





Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.