Duke Energy to Serve the Growing Energy Needs of a Thriving North Carolina

Source: www.gulfoilandgas.com 8/17/2023, Location: North America

- Maintains "all of the above" strategy calling for a diverse deployment of new technologies supported by the North Carolina Utilities Commission in its 2022 Carbon Plan
- Proposes new advanced nuclear at Belews Creek, new hydrogen-capable natural gas facilities at Roxboro and Marshall, plus significant increase in renewables and storage
- Retires coal by 2035; achieves carbon neutrality by 2050, as required by North Carolina's clean energy law under least-cost and reliability mandates

Duke Energy filed a new resource plan to advance the company's energy transition while prioritizing reliability and affordability – one designed to help maintain North Carolina's status as the nation's top state for economic development.

The Carbon Plan Integrated Resource Plan (CPIRP) builds on the trajectory of the North Carolina Utilities Commission's (NCUC) 2022 Carbon Plan, which established a least-cost path to meet the carbon dioxide emissions reduction targets of House Bill 951, North Carolina's clean energy law.

In the updated proposal, Duke Energy has identified new infrastructure needed to meet unprecedented growth in the Carolinas and to take the place of retiring coal plants: advanced nuclear at Belews Creek (Stokes County) and hydrogen-capable natural gas plants at Roxboro (Person County) and Marshall (Catawba County). The plan also significantly increases solar, storage and wind compared to the 2022 proposal, maintaining the "all of the above" strategy supported by the NCUC.

"This plan delivers a path to cleaner energy without compromising grid reliability, affordability or the energy demands of a growing region," said Kendal Bowman, Duke Energy's North Carolina president. "We project exponential growth, far beyond what has already made us the top state for business, so we've charted an ambitious road map for meeting that need while protecting reliability and affordability for our customers."

Reducing carbon while accommodating growth
Between economic development success, population growth and increased adoption of electric vehicles, energy use by Duke Energy customers in the Carolinas is projected to grow by around 35,000 gigawatt-hours over the next 15 years – more than the annual electric generation of Delaware, Maine and New Hampshire combined.

To accommodate this, the CPIRP includes three core energy portfolios for the NCUC to review and ensure a pathway to carbon reduction that is least-cost and maintains equal or greater reliability than customers have today. The three portfolios reach HB 951's interim 70% carbon reduction target by 2030, 2033 and 2035, respectively, utilizing the flexibility given to the NCUC under state law to protect reliability and encourage advanced nuclear and wind. All three portfolios reach carbon neutrality by 2050.

"We've already made tremendous progress in the energy transition, retiring two-thirds of our aging coal plants in the Carolinas and reducing emissions by 46% since 2005," said Bowman. "Now we're proposing specific new generation at existing plant sites, leveraging our current infrastructure, transmission system and workforce to save customers money while supporting job creation and tax base in these communities."

Diverse mix of resources to reliably meet growth
The new plan maintains Duke Energy's commitment to exit coal by 2035. To meet the significant increase in projected energy demand, all three proposed portfolios are more ambitious in pace and scale than the 70% by 2030 portfolio from the company's 2022 Carbon Plan proposal.

The company has recommended a "near-term action plan" based on the least-cost, least-risk portfolio. Activities in that plan would facilitate the following new resources:

- Solar – 6,000 megawatts (MW) by 2031
- Battery storage – 2,700 MW by 2031
- Hydrogen-capable natural gas – 5,800 MW by 2032, which includes replacing coal retirements at Roxboro (Person County) and Marshall (Catawba County)
- Wind – 1,200 MW onshore by 2033; preserve option of 1,600 MW offshore for 2033 or later
- Pumped-storage hydro – 1,700 MW by 2034 at Bad Creek Hydro in Oconee County, S.C., serving both states
- Advanced nuclear – 600 MW by 2035, partially replacing coal retirements at Belews Creek (Stokes County) and one other existing plant location to be determined

For perspective, 1 MW of dispatchable generation such as nuclear or natural gas can power 800 homes; 1 MW of solar or wind must be backed up by 1 MW of another on-demand resource (such as natural gas or storage) that is not dependent on the weather.

Duke Energy's industry-leading energy efficiency and demand response options – voluntary programs that incentivize customers to reduce their energy use and save money – will help keep the need for new resources as low as possible. Energy savings from these programs are projected to increase seven-fold over the next 15 years.

Stakeholder input critical to the process
Duke Energy held five stakeholder engagement meetings over a four-month period on technical, complex issues involving resource planning. More than 100 individuals, representing a diverse group of organizations that included customers, environmental advocates, community leaders and other industries, attended these virtual sessions.

The presentation materials and Q&A from these engagement sessions, as well as additional documents and links related to the Integrated Resource Plan (IRP) process, can be viewed on Duke Energy's IRP website. These technical sessions were augmented by environmental justice conversations in North Carolina that will continue with local community outreach in the months ahead for communities where new infrastructure is proposed.

More public input ahead
Today's filing in North Carolina begins a public regulatory process at the NCUC that involves the evaluation of thousands of pages of testimony and data from the company, other parties to the proceeding and the input of customers. The NCUC will hold public hearings before issuing its final CPIRP order by the end of 2024.

The same resource plan was also filed in South Carolina on Aug. 15. Regulators there will independently conduct their own proceedings to consider the IRP and are expected to issue an order in mid-2024.

The plan will be checked and adjusted every two years, incorporating technology advances, updated cost forecasts and applicable federal funding to ensure ongoing affordability and reliability for customers.

Duke Energy Carolinas/Duke Energy Progress
Duke Energy serves nearly 3.7 million households and businesses in North Carolina through two utilities, Duke Energy Carolinas (central and western North Carolina, including Charlotte, Durham and the Triad) and Duke Energy Progress (central and eastern North Carolina plus the Asheville region).

Duke Energy Carolinas owns 19,500 megawatts of energy capacity, supplying electricity to 2.8 million residential, commercial and industrial customers across a 24,000-square-mile service area in North Carolina and South Carolina. Duke Energy Progress owns 12,500 megawatts of energy capacity, supplying electricity to 1.7 million residential, commercial and industrial customers across a 29,000-square-mile service area in North Carolina and South Carolina.


Austria >>  12/6/2024 - Over 30 ‘newcomer’ countries are considering introducing nuclear power to mitigate climate change while strengthening energy security and bolstering e...
Philippines >>  12/6/2024 - As the Philippines embarks on the development of the country’s nuclear power programme, it is making progress in developing the necessary nuclear infr...

France >>  12/5/2024 - Otrera, a spin-off of the French Alternative Energies and Atomic Energy Commission (CEA) and a laureate of the France 2030 program, has successfully c...
Uzbekistan >>  12/5/2024 - The IAEA Director General has been in Uzbekistan this week as part of ongoing support to the country’s plans to harness nuclear science for its develo...

United Kingdom >>  12/4/2024 - Centrica plc (the "Company") is pleased to announce the extension of the lives of its four operational Advanced Gas-cooled Reactor ("AGR") nuclear pow...
United States >>  12/4/2024 - NANO Nuclear Energy Inc. (NASDAQ: NNE) (“NANO Nuclear” or “the Company”), a leading vertically integrated advanced nuclear technology company developi...




Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.