Seatrium Successfully Delivers Floating Production Unit for GoM Project

Source: www.gulfoilandgas.com 10/19/2023, Location: North America

- Seatrium successfully delivers Whale (Floating Production Unit), comprising a topside module and a semi-submersible hull, delivered on-time and within budget.
- The Whale project demonstrates Seatrium's engineering and innovation expertise, leveraging its previous experience to achieve a reduction in integration time while meeting international safety standards.

Seatrium Limited (Seatrium) announced the successful delivery of the Floating Production Unit (FPU), Whale, for deployment in the Gulf of Mexico, in accordance with the contract secured in November 2019 with Shell Offshore Inc.

The completed Whale FPU, which comprises a topside module and a four-column semisubmersible floating hull (of over 22,000 tonnes) delivered on-time and within budget, underscores Seatrium’s strong track record and leadership as a global player with deep engineering expertise.

Enabled by Seatrium’s game-changing Goliath twin cranes with a combined 30,000-tonne lifting capacity and a 100-metre hook height, the integration of the Whale FPU topside and hull in one single lift is a major milestone achievement for Seatrium, resulting in greater productivity and safety for the assembly of such mega-blocks before integration.

Leveraging Seatrium’s extensive experience in designing and building world-class FPUs, the Whale project demonstrates Seatrium's continuous efforts for improvement and innovation which has brought about tangible contributions of over two million man-hours saved and 30% reduction in hull and topside integration time. The project scores 96% on international standards for health, safety, and environment and complies with the International Association of Oil & Gas Producers1 (IOGP) 577 standards as well as the US Coast Guards statutory requirements.

In addition to strong engineering capabilities and timely project delivery, Seatrium adopts Environmental, Social and Governance (ESG) practices in its operations. The hull structure of Whale was fabricated in Seatrium’s state-of-the-art steel fabrication facility, powered by renewable solar energy, resulting in reduced carbon emissions during the construction process.

Mr Chris Ong, CEO of Seatrium said, "We are delighted to have successfully delivered the Whale FPU project, which marks a significant milestone in our journey as we continue to expand our footprint in the offshore market. We are committed to providing innovative and comprehensive solutions for a diverse range of offshore and marine applications. Our successful delivery of the Whale FPU project is a testament to our capabilities and expertise."


Brazil >>  12/6/2024 - Discussing solutions and projects for the development of the offshore oil and gas market and its supply chain is one of the objectives of the FPSO Sup...
Vietnam >>  12/2/2024 - PTSC Asia Pacific (“PTSC AP”), a joint venture between Yinson Production (49%) and PetroVietnam Technical Services Corporation (“PTSC”; 51%), has ex...

Brazil >>  11/29/2024 - Petrobras informs that it has initiated a new procurement process for the construction of up to two FPSO oil production units for the Sergipe Deep Wat...
Nigeria >>  11/28/2024 - Eni’s subsidiary Nigerian Agip Exploration Limited (NAE) and STAC Marine celebrate one year of successful collaboration for the operation and maintena...

Guyana >>  11/21/2024 - SBM Offshore announces it has completed the project financing of FPSO Jaguar for a total of US$1.5 billion.

The project financing was f...

Brazil >>  11/17/2024 - Yinson Holdings Berhad (“Yinson”) proudly hosted Malaysia Prime Minister, The Honourable Anwar Ibrahim at a networking reception in Rio de Janeiro t...




Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.