QatarEnergy Announces Award of $6B EPC Contracts for Al-Shaheen Oil Field Development

Source: www.gulfoilandgas.com 1/31/2024, Location: Middle East

QatarEnergy has announced the award of the four main Engineering, Procurement, Construction, and Installation (EPCI) contract packages related to the next development phase of the offshore Al-Shaheen field (Qatar’s largest oil field) to increase production by about 100,000 barrels of oil per day (BPD).

The award is part of Project Ru’ya (vision in Arabic), which is the third phase of Al-Shaheen’s development since North Oil Company, a joint venture between QatarEnergy (70%) and TotalEnergies (30%), took over the field’s operation in July 2017.

Project Ru’ya, which will develop more than 550 million barrels of oil, will be executed over a period of 5 years with first oil expected in 2027. The project includes the drilling of more than 200 wells and the installation of a new centralized process complex, nine remote wellhead platforms, and associated pipelines.

The four EPC packages, with varying scopes of work, valued in total at more than six billion dollars, comprise of:

(i) the EPC package for 9 wellhead platforms valued at about $2.1 billion and awarded to a consortium of McDermott Middle East Inc. and Qingdao McDermott Wuchuan Offshore Engineering Co.;

(ii) the EPC package for a Central Processing Platform valued at about $1.9 billion and awarded to a consortium of McDermott Middle East Inc. and Hyundai Heavy Industries;

(iii) the EPC package for a riser platform valued at about $1.3 billion and awarded to Larsen & Toubro Limited; and

(iv) the EPC package for subsea pipelines and cables valued at about $900 million and awarded to China Offshore Oil Engineering Co (COOEC).

His Excellency Mr. Saad Sherida Al-Kaabi, the Minister of State for Energy Affairs, the President and CEO of QatarEnergy, welcomed the award of the contract packages as an important milestone in the development of the State of Qatar’s largest oil field. His Excellency said: 'By awarding these contracts, we are taking an important step towards realizing the full potential of Al-Shaheen filed, which produces around half of Qatar’s crude oil today.'

His Excellency Minister Al-Kaabi added: 'I would like to thank North Oil Company and our longtime strategic partner TotalEnergies for their great efforts towards unlocking the true potential of Qatar’s hydrocarbon resources and maximizing value from Al-Shaheen field through the implementation of world-class development and operational excellence programs.'

Al-Shaheen field is located 80 kilometres offshore Qatar and is among the world’s largest in terms of 'oil in place'. The field commenced commercial production in 1994 and underwent significant development to reach an oil production rate of 300,000 bpd in 2007.


Guyana >>  4/13/2024 - Following the press release of 29 November 2023, Saipem informs that it has received from ExxonMobil Guyana Limited and its Stabroek block coventurers...
India >>  4/10/2024 - Nuberg EPC, a Global EPC and turnkey project management company, is proud to announce its latest undertaking: India’s largest Chlor-Alkali project, co...

Norway >>  4/10/2024 - Kent, a global integrated energy services provider has been awarded a comprehensive 3-year framework contract with Repsol Norge for various operations...
Norway >>  4/8/2024 - Aker Solutions has been awarded a sizeable [1] EPCIC-contract for the Brasse tieback project for OKEA.

Brasse is an oil and gas field loca...


Canada >>  4/5/2024 - Cedar LNG announced that it has issued a Notice to Proceed (NTP) to the engineering, procurement, and construction (EPC) contractors following the fin...
United States >>  4/4/2024 - Black & Veatch, a global engineering, procurement, construction (EPC) and consulting leader, is revolutionizing industrial cybersecurity by moving the...




Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.