Gulf Oil and Gas accountACCOUNT

Oil Field Services News in Australia

Tempo Australia Lands Trade Labor Resources Deal with Santos
12/8/2014 - Tempo Australia Limited announced that its subsidiary, Tempo Construction & Maintenance Pty Ltd, has been awarded a three-year general services contract with Santos Limited for trade labour resources,...
Bass Strait Oil Announces Cancellation of Vic/P66 Permit
3/25/2014 - Bass Strait Oil Company Ltd has received formal notice cancelling Petroleum Exploration Permit Vic/P66 in the Gippsland Basin, with the process formally approved by the National Offshore Petroleum Tit...
Tangiers Announces Cancellation of Permits NT/P81 & WA-442-P
3/24/2014 - Tangiers Petroleum Limited (Tangiers) advise that the site survey has been completed at the location of the TAO-1 well, offshore Morocco, and is compatible for the use of a jack-up rig. A Novation Agr...
Floods Halt Coal Seam Gas Drilling in Surat Basin
1/10/2011 - Coal seam gas drilling in Australia's Surat Basin, a major source of gas for an estimated $200 billion of proposed liquefied natural gas projects to be built this decade, has been halted by flooding. ...
Eni Starts Development of Kitan and Timor-Leste
4/22/2010 - Eni has started the development of the Kitan oil field, located in the permit 06-105 of the Joint Petroleum Development Area (JPDA) between Timor-Leste and Australia, approximately 250km south of the ...
Apache First Oil Production from Pyrenees Development
3/1/2010 - Apache Corporation announced that its subsidiary, Apache PVG Pty Ltd, has commenced oil production from the Pyrenees development in production license WA-42-L in the Exmouth Basin offshore Western Aus...
Beach suspends Wakefield well pending further evaluation
9/29/2009 - Beach Petroleum reports that the Wakefield-1 exploration well in PEL 218 (Cooper Basin, South Australia) has encountered oil and gas shows at multiple levels and has been cased and suspended pending f...
Marino-1 to Be Abandoned As a Sub-Commercial Oil Discovery
8/31/2009 - Drillsearch Energy Limited is pleased to provide this drilling update for the Marino-1 well. Following evaluation of the results from the drillstem test the joint venture has reached the conclusion th...
Chevron Gets Australian Govt Approval for the Gorgon Project
8/26/2009 - Chevron Australia Pty Ltd welcomed the timely approval of the Chevron-operated Gorgon Project's revised and expanded scope by the Federal Environment Minister, the Hon. Peter Garrett AM MP. ...
Jingemia 12 Oil Development Well-Northern Perth Basin
8/6/2009 - Origin Energy, on behalf of the L14 Joint Venture parties, advises that the Jingemia 12 oil development well was drilled to a total depth of 2,709.5 metres measured depth. The well intersected a hydro...
Growler Oil Field Status Report PRL 15
7/7/2009 - Victoria Petroleum N.L. as operator for the PRL 15 Joint Venture and the Growler Oil Field advises that the construction phase of the upgrade of the Growler Oil Field production facility has been comp...
ExxonMobil Announces $1.1 Billion Turrum Field Development
7/25/2008 - Exxon Mobil Corporation announced the Gippsland Basin Joint Venture, which includes its subsidiary, Esso Australia, will invest $1.1 billion to develop more than 270 million oil-equivalent barrels fro...
Development Area for the Kitan oil field
6/10/2008 - Inpex Holdings announced that its subsidiary Inpex Timor Sea, Ltd. has received the approval of the Development Area for the Kitan oil field from the Timor Sea Designated Authority (TSDA) following th...
Apache Reports Pipeline Rupture and Fire at Varanus Island Processing Hub Offshore Western Australia
6/3/2008 - Apache Corporation reported a pipeline rupture and fire at its Varanus Island gas processing and transportation hub offshore Western Australia. No one was injured and 153 people were evacuated followi...
Successful Gas/Condensate Horizontal Well for Mosaic Oil at Waggamba-4H PL202 Surat-Bowen Basin
5/5/2008 - Mosaic Oil NL advised that the Waggamba-4H gas/condensate horizontal development well has been successfully completed for production. On clean-up flow, the Waggamba-4H well has flowed at a stabilised ...

Camp Building Cleaning Equipment, Services Communication Corrosion Products/Services Development Exploration General Labor Services Land & Leasing Mine Clearance Oil & Gas Companies Production Service Companies Transportation, 4X4 Trucks Utility Systems Water Supply Services Welding Products/Services
For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Gulf Oil and Gas
Copyright Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.