Well Completion, Logging, Workover News in Russia

Well #431 Commissioned After Total Overhaul on Gunashli
9/28/2012 - Gunashli field plays an important role in oil and gas industry of the country. New wells are drilled, as well as idling ones are commissioned there after taking necessary technical measures. ...
Gazprom Completing Bovanenkovo Field Pre-Commissioning
Gazprom Completing Bovanenkovo Field Pre-Commissioning 3/11/2012 - Pre-commissioning work entered its final stage at the first startup complex of the Bovanenkovo field. Gas produced from the field was conveyed to the comprehensive gas treatment unit (CGTU) module 1. ...
Exillon Provides Drilling and Operations Update
3/26/2010 - Exillon Energy plc is pleased to announce the successful completion of the EWS-15 well with an oil flow rate of 550 bbls/day from the Jurassic interval and confirmation of the presence of a reservoir ...

Formation Evaluation General Geological, Geophysical Geophysical Contractors Mud Logging Reservoir Engineering & Recovery Methods Seismic survey Well Completion, Logging, Workover
For Buyers
For Suppliers
Gulf Oil and Gas
Copyright 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.