| 5/30/2025 - 2012 meters, 2295 meters, 1860 meters. Since the beginning of May, the Repu 6-H6 well, Ha 13-H13 well, and Ha 13-H11 well in the Tarim Oilfield have been "competing" with daily footage exceeding 1 mil... |
| 5/29/2025 - The cumulative drilling footage of Zhongyuan Petroleum Engineering Company this year has exceeded 1 million meters. Since the beginning of this year, the company has comprehensively optimized its mark... |
| 5/26/2025 - The reporter learned from the Great Wall Drilling Western Drilling Branch that the Su 11-42-66 well in Changqing Oilfield, which was constructed by the company's 40500 team, achieved a footage of 1,6... |
| 5/14/2025 - China Petroleum & Chemical Corporation (HKG: 0386, "Sinopec") has announced a major shale gas exploration breakthrough of its Project Deep Earth - Sichuan and Chongqing Natural Gas Base, that its T... |
| 2/25/2025 - China National Petroleum Corporation (CNPC) announced the successful completion of the Well Shendi Take-1, reaching an impressive depth of 10,910 meters. This groundbreaking achievement marks the well... |
| 10/31/2024 - China Petroleum Network News (Special Correspondent Zhang Qiuliang and Zhang Wenqiong) On October 28, at the construction site of the GY16-Q9-H25 well in Daqing, Zhao Fusheng, captain of the Bohai Dri... |
| 7/27/2024 - China Petroleum Network News (Special Correspondent Wang Danling, Correspondent Li Rui) In mid-July, the geothermal test well Anre 1 well, located in Anxin County, Xiong'an New Area, implemented by Hu... |
| 6/28/2024 - China Petroleum Network News (Correspondent Li Bo) As of June 23, Sichuan Petroleum Drilling Changqing Cementing Company has completed cementing 5,023 wells and 1,544 wells, achieving more than half... |
| 6/27/2024 - China Petroleum Network News (Correspondent Dai Shilei and Wang Nan) On June 25, the author learned that the horizontal section of the side drilling of the Su 10-51-X well undertaken by Great Wall Dri... |
| 6/27/2024 - China Petroleum Network News (Correspondent Yin Jie and Wei Xianggao), the author learned that the Liuye 1H well, a risk exploration well of the group company and the first shale oil horizontal well i... |
| 4/10/2024 - China Petroleum & Chemical Corporation (HKG: 0386, "Sinopec") has successfully completed the drilling of China's deepest geothermal exploration well, the Fushen-1 Well in Hainan with a well depth of 5... |
| 11/16/2023 - Sinopec’s “Deep Earth Project Shunbei Oil and Gas Field Base” (known as “Deep Earth No. 1”) deployed in the Tarim Basin jumped into Well 3-3XC The test achieved high-yield oil and gas flow, with a dai... |
| 11/15/2023 - Sinopec struck sizeable oil and gas flows in the Yuejin 3-3XC well of its Project Deep Earth NO.1 in the Tarim Basin, with a daily hydrocarbon flow of 200 tonnes in liquids and 50,000 cubic meters i... |
| 10/11/2023 - The Sichuan Qing 90205 drilling team carried out air drilling operations in the third well section of the Bozi 24-5 well and successfully drilled to a well depth of 5,100 meters, creating a domestic a... |
| 5/4/2023 - China Petroleum & Chemical Corporation ("Sinopec") has initiated the drilling of Project Deep Earth 1-Yuejin 3-3XC Well ("the Well") on May 1 in the Tarim Basin, Xinjiang Uyghur Autonomous Region. Wit... |
| 3/13/2023 - The drilling of Well Guole 3C, located at the Fuman Oilfield in the Tarim Basin, was completed at a depth of 9,396 meters, making it the deepest
horizontal well in Asia. ... |
| 1/17/2023 - Horizon is pleased to advise that four WZ12-8E Phase 2 wells in Block 22/12, Beibu Gulf, China, have been successfully drilled, completed and brought onto production. This completes the Phase 2 drilli... |
| 12/30/2022 - China Petroleum & Chemical Corporation ("Sinopec") announced that its Yuanshen-1 risk exploration well in the Sichuan Basin had successfully completed the drilling at a depth of 8,866 meters, beating ... |
| 12/20/2022 - Empyrean Energy (AIM), the oil and gas development company with interests in China, Indonesia and the United
States, is pleased to provide its Interim Report for the six months ended 30 September 202... |
| 10/28/2022 - Horizon is pleased to advise that the two planned infill wells in the WZ6-12 fields of Block 22/12, Beibu Gulf, People’s
Republic of China, have been successfully drilled and completed. The Strike dr... |