Lifting & Handling Equipment News in Norway

Saipem - Follow-up & Handling of Non-Conformities – Scarabeo 8
11/21/2022 - The Petroleum Safety Authority Norway (PSA) has carried out an audit of Saipem and their follow-up and handling of observations on Scarabeo 8. The audit was conducted on 7 October 2022.

Ob...
FREYR Battery Selects NTE Process as Equipment Supplier
9/8/2022 - FREYR Battery, a developer of clean, next-generation battery cell production capacity, has awarded an agreement to Italy-based NTE Process to supply a complete and integrated drying and powder handlin...
Equinor – Martin Linge – Materials Handling & Working Environment
9/8/2022 - The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor and its management of materials handling and the working environment on the Martin Linge B facility. The audit was condu...
Repsol – Yme – Management of Oil Loading & Dynamic Positioning
8/22/2022 - The Petroleum Safety Authority Norway (PSA) has carried out an audit of Repsol and its management of oil loading and dynamic positioning (DP) on the Yme field.

The audit was conducted on 2...
Notice of Audit at Equinor – Mongstad
6/15/2022 - The Petroleum Safety Authority Norway (PSA) has given notice that it will conduct an audit of Equinor after a series of incidents at the Mongstad plant. These undesirable incidents have related to mat...
Kalmar's New High-Capacity Electric Reachstacker to be Field Tested by CargoNet
2/24/2022 - Kalmar, part of Cargotec, has signed a one-year agreement with Norwegian rail operator CargoNet covering the field-testing of a Kalmar Electric Reachstacker. Following the conclusion of the agreement,...
Kalmar to Supply 1st Electric Reachstacker to Westport in Norway
1/12/2022 - Kalmar, part of Cargotec, has concluded an agreement with Westport AS to supply a Kalmar Electric Reachstacker to support their decarbonization efforts. The order, which also includes a five-year Kalm...
Var Energi – Goliat – Management of Materials Handling & Work at Height
12/7/2021 - The Petroleum Safety Authority Norway (PSA) has carried out an audit of Var Energi and their management of materials handling and work at height on the Goliat FPSO. The audit was conducted from 8 to 1...
Equinor – Heimdal – Materials Handling
12/2/2021 - The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor and its materials handling at Heimdal.

The audit was conducted from 25 to 28 October 2021.

Objec...
Equinor – Management of Lifting Operations & System for Safe Materials Handling in the Company
11/24/2021 - The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor’s management of lifting operations and system for safe materials handling in the company. The audit was conducted from 7...
Equinor – Johan Sverdrup – Investigation of Lifting Incident with Personal Injury
9/30/2021 - The Petroleum Safety Authority Norway (PSA) has completed its investigation of a lifting incident with personal injury on the Johan Sverdrup field on 13 May 2021. Serious breaches of the regulations h...
Wartsila Emphasised with Order to Supply 4 Gas Carriers at DSME
7/1/2021 - The technology group Wartsila will supply its advanced Cargo Handling System for four new 91,000 cbm capacity Very Large Gas Carrier (VLGC) vessels being built for the Norway-based fleet owner Avance ...
Equinor – Hammerfest LNG – Materials Handling, Cranes and Lifting, & Maintenance
6/30/2021 - The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor focused on materials handling, cranes and lifting, work at height, including scaffolding, and maintenance at Hammerfest ...
Equinor – Troll A – Materials Handling
6/2/2021 - The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor and materials handling at the Troll A facility. The audit was carried out from 3 to 11 May 2021.

Objective
Equinor - Handling of Gas Leak Incident
4/15/2021 - The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor focused on their handling of an incident involving a gas leak from a flow line in March 2020.

From 4 to 10 Fe...
Equinor - Njord A - Materials Handling, Drilling Equipment & Working Environment
4/8/2021 - The Petroleum Safety Authority Norway has carried out an audit of Equinor within the domain of materials handling drilling equipment and the working environment.

The audit was carried out ...
Equinor – Martin Linge – Materials Handling & Working Environment
4/7/2021 - The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor focused on materials handling and the working environment at Martin Linge.

The audit was conducted from 22 t...
Materials Handling Works at Height & Falling Objects at Tjeldbergodden
1/28/2021 - The Petroleum Safety Authority Norway has conducted an audit of Equinor concerning materials handling, cranes and lifting, work at height and falling objects at Tjeldbergodden. The audit identified br...
PSA Investigates Lifting Incident with Personal Injury on Heidrun
1/18/2021 - The Petroleum Safety Authority Norway (PSA) has launched an investigation of a serious lifting incident involving personal injury on the Heidrun field on 17 January 2021. ...
First Operation of Bollard Pull AHTS Vessel for Lundin Petroleum
3/21/2016 - BOURBON has taken delivery, as scheduled, of the Bourbon Arctic from the Vard Brattvag shipyard (Norway) and completed her first anchor handling operation. The vessel was engaged in the disconnection ...

Cranes Forklifts General Laydown & Pickup Equipment
For Buyers
For Suppliers
Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.