Gulf Oil and Gas accountACCOUNT

Testing News in Australia

Woodside Awards Scarborough Geotechnical Campaign to Benthic
2/5/2019 - Benthic, a global geosciences company, has been awarded a contract by Woodside for an offshore geotechnical investigation in the North Carnarvon Basin, offshore Western Australia. The contract include...
Senex Energy's Gemba-1 Well in the Cooper Basin Flows at 8 mmscfd on Test
12/17/2018 - Senex Energy has successfully completed the initial flow test of the Gemba-1 gas exploration well in the Cooper Basin, with stabilised flow rates of approx. 8 million standard cubic feet per day, plus...
C-Kore Subsea Testing Units Successfully Deployed by PTTEP
7/17/2018 - C-Kore Systems Ltd recently completed another successful deployment for PTTEP Australia. The supplied C-Kore Subsea Testing units optimized the offshore operation, quickly bringing the field back on-l...
Real Energy Provides Update on Cooper Basin Well Tamarama-1
1/31/2017 - Cooper Basin focused oil & gas exploration company Real Energy has advised that, following test work undertaken in the last two weeks, the Tamarama-1 well is currently shut in ahead of further operati...
Empire Oil & Gas Reports Gas Condensate Discovery at Red Gully North-1
1/18/2017 - Perth Basin domestic gas producer Empire Oil & Gas has announced that flow testing of its Red Gully North well has confirmed good flow rates of both condensate and gas, indicating the well has found a...
Historic Flows from Oz Offshore Well
10/19/2016 - Quadrant Energy has confirmed a successful well test from the Roc-2 well, 165 km north of Port Hedland in the Bedout Basin. ...
Transerv Spuds First of Two key Test Wells on Australia’s Largest Undeveloped Field
8/18/2015 - Transerv Energy (TSV) is pleased to announce that it has started the pivotal two-well drilling program aimed at unlocking the potentially immense value of Australia’s biggest undeveloped onshore gas f...
Intertek Opens Fuels Testing Laboratory in Gladstone
8/12/2015 - Intertek, a leading provider of quality and safety services to a wide range of industries around the world, has announced the opening of a new fuels testing laboratory in Gladstone, Queensland. ...
Senecio-3 Well Confirms Commercial Potential of Waitsia Field
3/9/2015 - AWE Limited as the Operator of the L1/L2 joint venture, provides the following update on the flow testing program at the Senecio-3 well, in the onshore Perth Basin, Western Australia. ...
Dingo Gas Pipeline & Plant Successful Hydro-Testing
3/9/2015 - Central Petroleum Limited announced the pressure testing (hydro-testing) of the Dingo Pipeline and the plant and field gathering system has been successfully completed. ...
Intertek Acquires Adelaide Inspection Services Pty Ltd
2/3/2015 - Intertek Group plc (Intertek) a leading quality solutions provider to industries worldwide, has acquired Adelaide Inspection Services Pty Ltd (AIS) for a total cash consideration of AUD 12 million (GB...
Expro Secures Major Contract Offshore Australia
10/15/2014 - Expro, has secured a major new contract to supply a high rate well testing package and ancillary services for the INPEX-operated Ichthys LNG Project. ...
Karoon Gas to re-test Poseidon-2 well
1/28/2010 - Karoon advises that production testing of the Plover reservoir was in progress. The well was perforated and communication to the reservoir has been established. Results will be released as soon as the...
Origin Confirmed High Flow Rate As Initial Testing Commences
11/18/2009 - Origin Energy, on behalf of the L11 Joint Venture, has advised that the exploration well Redback South-1, which was completed in October, began a well testing program on 17 November 2009. The well was...
Tigercat-1 Short Term Production Test Result, Pel 104
9/14/2009 - Victoria Petroleum N.L. as operator for the PEL 104 Joint Venture advises that The Short Term Production Test (STPT) carried out over the weekend at Tigercat-1 has resulted in a measured swabbed flow ...
Snatcher-2 Flows 207 bobd on Short Term Production Test
9/1/2009 - Victoria Petroleum N.L. as operator for the PEL 111 Joint Venture advises that the Short Term Production Test at Snatcher-2 has resulted in a flow to the surface from the Birkhead Formation of clean 4...
Snatcher-1 Flows 218 Barrels of Oil per Day
7/27/2009 - Victoria Petroleum N.L. (Vicpet) as operator for the PEL 111 Joint Venture advises that the Short Term Production Test at Snatcher-1 has resulted in a flow to the surface from the Birkhead Formation o...
Oilex Completes Donga-3 Well as Oil Producer
3/16/2006 - Victoria Petroleum N.L. has been advised by the operator Oilex N.L that the Donga-3 well has been successfully completed, pumping equipment installed and a long term production test commenced. The wel...

General Hydrostatic Testing Inspection Laboratory Services Non Destructive Testing Testing
For Buyers
For Suppliers
Gulf Oil and Gas
Copyright © 2020 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.