12/27/2011 - Testing operations on Block 15 onshore Oman have resumed. A jet pump has been installed in the JAS-2 well in an attempt to clear the well from water an enable it to flow hydrocarbons. The Block 15 lic... |
7/6/2010 - The Saiwan East-3 well (“SE-3”) in Block 4 onshore the Sultanate of Oman has completed production testing of the horizontal section drilled in the Khufai reservoir. The maximum rate achieved during th... |
3/23/2010 - RAK Petroleum PCL, the oil and gas exploration and production company, announced that it has tested gas in the Hamrat Duru 4 well in Block 30, Sultanate of Oman. ... |
1/25/2010 - Tethys Oil announced that a production test using a down hole Electrical Submersible Pump (ESP) has been completed in the Barik formation in the Farha South-3 well on Block 3 onshore Oman. The excelle... |
1/18/2010 - Tethys Oil concluded the testing operations of the heavy oil zones encountered in East Saiwan-2 on Block 4 onshore Oman. The objective of the testing was to verify mobility and produce heavy oil to su... |
11/13/2009 - Tethys and partner CCED (Oman) Ltd (operator) have contracted MB Petroleum LLC to provide the MB 49 work over rig to conduct testing operations on Blocks 3 and 4 onshore Oman. The 450 hp rig is curren... |
9/15/2008 - The testing of the Jebel Aswad 2 well (JAS-2) on Block 15 onshore Oman has been suspended. The well was completed on August 18, 2008 after drilling some 4,018 metres, including a near kilometre long h... |
3/4/2008 - Oilex advised that preparations are underway to conduct Drill Stem Test (DST) #3 of the Lower Gharif Formation in the Sarha-1 well located in Exploration and Production Sharing Agreement Block 56, Oma... |
2/25/2008 - Oilex advised that oil has been recovered at the surface in cased hole Drill Stem Test (DST) #2 of the Al Khlata Sandstone in the Sarha-1 well located in Exploration and Production Sharing Agreement B... |
12/6/2007 - A comprehensive programme of flow tests and collection of gas and oil samples has been conducted in the Jebel Aswad well on Block 15 onshore Oman. A higher condensate gas ratio (up to 25% higher) was ... |
6/25/2007 - Testing of the Jebel Aswad re-entry has now been completed in Block 15, Oman. Both the Shuaiba and Natih limestones were penetrated during the drilling phase of the re-entry and both reservoirs have p... |
1/5/2007 - Indago Petroleum announced that Indago Oman Limited , as operator for the Block 8 Joint Venture (comprising IOL 40%, Eagle Energy (Oman) Limited 10% and LG International Corporation 50%), has conclude... |
11/21/2006 - Indago Petroleum announced that Indago Oman Limited ('IOL') (a wholly owned subsidiary of Indago Petroleum Limited), as operator of Block 8, along with our partners, Eagle Energy (Oman) Limited (10%) ... |
11/8/2006 - Indago Petroleum announced that Indago Oman Limited, as operator of Block 8, along with our partners, Eagle Energy (Oman)Limited (10%) and LG International (50%), has commenced testing operations on t... |