Turbines (General) News in Brazil

Nordex Group Receives Order for 456 MW from Brazil
7/8/2022 - The delivery and installation of 80 N163/5.X turbines for the Brazilian "Feijo" wind farm have been ordered from the Nordex Group by a joint venture between Macquarie Asset Management's Green Investme...
Vestas and EDF Renewables Seal 261 MW Deal in Brazil
6/30/2022 - Vestas has secured a 261 MW order for the Serra das Almas wind park, which is located at the municipality of Urandi, in the state of Bahia. The order, placed by long-term customer EDF Renewables in Br...
Vestas Partners with PEC Energia for 86 MW Wind Park in Brazil
6/30/2022 - PEC Energia, an Engeform Energia Renovável company, has signed an agreement with Vestas to power the Serra das Vacas wind park in the state of Pernambuco, Brazil. The project will feature 19 V150-4.5 ...
Vestas Partners with LM Wind Power for V150-4.2 MW Blade Production in Brazil
4/1/2022 - In the continuous journey to develop the wind energy supply chain and produce main components close to key markets, Vestas has further strengthened the flexibility of its global manufacturing footprin...
Vestas Receives a 248 MW Order from Elera Renovaveis in Brazil
12/31/2021 - Vestas has secured the order from Elera Renovaveis for the 248 MW Serido Oeste project, located in Parelhas, Rio Grande do Norte, Brazil.

The pr...
Nordex Receives Order in Brazil from AES Brasil for 370 MW
11/30/2021 -  AES Brasil has once again commissioned the Nordex Group to supply and install N163/5.X turbines in Brazil. Following the 314 MW order for the “Cajuína” wind farm in June 2021, AES has now ordered a f...
Vestas Wins 212 MW Order in Brazil
5/6/2021 - Vestas has signed a new agreement with Omega Energia for the 212 MW Assuruá 4 project, located in the cities of Gentio do Ouro and Xique-Xique, in Bahia. The order includes 47 V150-4.2 MW wind turbine...
Siemens Gamesa Signs Second Standout Deal in Brazil
1/22/2021 - Siemens Gamesa’s global partnership with leading electricity supplier Engie has grown stronger following the signing of a 434 MW contract to supply the benchmark Siemens Gamesa 5.X onshore platform to...
Nordex Group Obtained Accreditation in Brazil
1/14/2021 - The Nordex Group has obtained the accreditation in Brazil for the N163/5.X wind turbine model from BNDES – National Bank for Economic and Social Development, which is the largest public development ba...
Nordex Received Major Order for 518 MW from Statkraft in Brazil
1/13/2021 - At the end of 2020, Statkraft Energias Renováveis – the Brazilian subsidiary of Europe’s biggest producer of renewable energy, the Norwegian Statkraft – placed a large-scale order with the Nordex Grou...
Vestas and European Energy Seal 95 MW Deal for 2 Projects in Brazil
12/31/2020 - Vestas has secured a 95 MW order from European Energy, in partnership with Eólica Tecnologia, for the Ouro Branco and Quatro Ventos wind projects in the state of Pernambuco in Brazil.

The o...
Siemens Strikes 465 MW Mega Deal in Brazil
12/23/2020 - - Sao Vitor Wind Farm is expected to be commissioned by the end of 2022 and will consist of 75 SG 5.8-170 turbines, boasting one of the largest rotors on the onshore market
- Deal is largest eve...
Vestas Secures 360 MW order with Casa Dos Ventos in Brazil
12/23/2020 - Vestas has signed a new agreement with Casa dos Ventos for the 360 MW Babilonia project, located in the cities of Morro do Chapeu and Varzea Nova, in Bahia. As the fourth contract between the companie...
Vestas Wins 534 MW Order in Brazil
12/1/2020 - With reference to company announcement no. 43/2020 of 1 December 2020, Casa dos Ventos, one of the pioneers and largest investors in the development of wind projects in Brazil, has placed a 534 MW ord...
Vestas Receives 409 MW Order in Brazil
8/28/2020 - Vestas has received a 409 MW order from the joint venture between Votorantim Energia and the Canadian fund CPP Investments for the projects Ventos do Piauí II and Ventos do Piauí III, in Serra do Inác...
Vestas Clinches Record Brazil Deal as V150 Smashes 1.5GW
6/18/2019 - Casa dos Ventos, one of the pioneers and largest investors in the development of wind projects in Brazil, has placed a 445 MW order for the supply and installation of 106 Vestas V150-4.2 MW wind turbi...
Alstom Signs New Contracts to Supply Hydro Mechanical Equipment to Belo Monte Complex
7/14/2015 - Alstom concluded two contracts with Norte Energia to provide equipment to the Belo Monte hydroelectric complex, located at Xingu River, in Brazil’s northern Para state. ...
Alstom to Sell Steam Turbines on the Brazilian Market
Alstom to Sell Steam Turbines on the Brazilian Market 4/28/2015 - Alstom and NG Metalurgica, a leading Brazilian manufacturer of steam turbines and other equipment, have signed a cooperation agreement to jointly approach the Brazilian market for high performance sma...

Diesel Engine Engine Parts General Generating Sets Generators Marine Diesel Engine Power Pack Turbines (General) Turbines: Gas Turbines: Hydro Turbines: Steam
For Buyers
For Suppliers
Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.