6/22/2022 - Power-to-Liquids technologies are on their way to commercialization in scale. E-fuels offer a way to expand the carbon-neutral transport fuel pool beyond biomass-based renewable fuels to replace fossi... |
3/24/2016 - Amec Foster Wheeler announces today that it has been awarded a contract to supply a biomass dust combustion plant for Finnish utility company Seinajoen Energia Oy. The plant will be operated as back-u... |
6/13/2013 - Technip was awarded by Forest BtL Oy a contract, worth approximately €5 million, for the front-end engineering and design (FEED) of a new second generation biomass-to-liquid (BTL) plant to be built on... |
3/11/2013 - Vaskiluodon Voima Oy has inaugurated the world’s largest biomass gasification plant, which was supplied by Metso, in Vaasa, Finland. The plant was inaugurated by the Finnish Minister of Labour Lauri I... |
2/6/2013 - Forest BtL Oy of Finland and Axens have signed a license for the use of Gasel technology suite in the Biomass to Liquid (BtL) plant to be constructed in Ajos, near the city of Kemi, Finland. ... |
5/26/2010 - Foster Wheeler AG announced the successful start of commercial operation of a large-scale, 125 MWe (385 MWth), circulating fluidized-bed (CFB) boiler island delivered to Kaukaan Voima Oy, in Finland. ... |
5/12/2008 - Foster Wheeler awarded a contract by NSE Biofuels Oy Ltd. for a circulating fluidized-bed (CFB) biomass gasifier to be located in Varkaus, Finland. NSE Biofuels Oy Ltd. is a joint venture owned 50/50 ... |