Mooring Systems News in Brazil

Maersk Supply Service Wins its Largest Project Contract Ever
6/21/2021 - Maersk Supply Service has secured a major project contract for the Libra Consortium in Brazil concerning the pre-lay of the mooring system for a newbuild FPSO in Brazil. The project is integrating eng...
Fugro Awarded Jumbo Positioning Contract Offshore Brazil
4/21/2021 - Fugro is providing positioning and construction support services for Jumbo Maritime, a leading offshore installation contractor, on the Mero 1 deepwater field development located approximately 180 km ...
Royal IHC Awarded Major Contract for Supply of FPSO Equipment
8/6/2020 - Malaysian FPSO provider Yinson has awarded Royal IHC a contract for the supply of a tandem mooring & offloading system and a riser pull-in system. The equipment will be placed onto the Anna Nery float...
Important Mooring Equipment for OSX-1 Arrives in Rio
9/16/2011 - Arrives this weekend in Rio de Janeiro the detachable buoy (turret) that is part of the mooring system of the FPSO OSX-1, the OSX production unit that will be used in the extraction of the first OGX o...
Parker Wins Mooring Contract by Subsea 7 in Brazil
6/14/2011 - The Energy Products Division of Parker Hannifin Corporation, the global leader in motion and control technologies, has been awarded a contract from Subsea 7 for one of the world’s largest mooring proj...
Arrive in Brazil the Mooring System’s Anchor Piles of FPSO OSX-1
4/6/2011 - OGX took a further step necessary for initial production in the Campos Basin. The ten anchor piles that compose the mooring system that will fix the first floating production storage and offloading un...
Petrobras Takes Lankhorst Ropes for MODU Mooring
3/24/2011 - Leading deepwater rope manufacturer, Lankhorst Ropes, has secured the first-ever, worldwide order for Dyneema synthetic mooring rope for deepwater MODU (Mobile Operating Drilling Unit) projects from B...
Aker Wins Contracts for Mooring & Loading System
11/22/2010 - Aker Solutions has won two contracts for the supply of mooring and loading systems in Brazil. The contracts have a combined value of approximately NOK 210 million. ...
Aker Solutions Enters Brazilian Installation Market
7/8/2009 - Aker Solutions has signed a contract with Maersk FPSOs to perform the mooring installation work at the Peregrino field offshore Brazil. The contract is the first marine installation job for Aker Solut...

Diving Contractors Dredging FPSO Vessels and Equipment General Marine Services Mooring Systems Offshore Platforms Subsea Production
For Buyers
For Suppliers
Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.