Production News

Iran to Boost Output at Hengam Joint Oilfield with Oman
Iran >> 7/9/2013 - Iran will boost output at the Hengam oilfield, which is associated with Oman in the Persian Gulf, to 30,000 barrels per day. ...
OMV Shuts in Libya Production
Libya >> 7/9/2013 - Due to the current political situation in Libya, most of OMV’ s production in the country has been shut-in since June 25, 2013. In 2012, Libya contributed approximately 30,000 boe/d to OMV’s total pro...
Iranian Early Oil Production Plans to Come Online This Year
Iran >> 7/6/2013 - Managing-Director of the National Iranian Oil Company (NIOC) Ahmad Qalebani announced that early production from Yaran, Yadavaran and Northern Azadegan oil fields will start before the end of the curr...
Santos & Drillsearch Agree to Accelerate Cooper Basin Production
Australia >> 7/4/2013 - Santos announced the execution of a binding agreement with Drillsearch Limited (Drillsearch) relating to a series of permits in South Australia and Queensland that will see Santos grow its significant...
Khulud Tight Gas Production Tests Eyed Later this Year
Oman >> 7/2/2013 - Production tests targeting Petroleum Development Oman’s (PDO) Khulud tight gas fields in North Oman are slated to commence later this year, marking a key step in the majority government owned company’...
Petrobras Sets New Refinery Production Record
Brazil >> 7/2/2013 - Petrobras announces that on June 29th and 30th established a production record of 2.2 million barrels/day of oil at its refineries. This volume is 30,000 barrels more than the previous record, set on ...
Petrofac Signs MOU with KMG EP of Kazakhstan
Kazakhstan >> 7/1/2013 - Petrofac announces that it has signed a Memorandum of Understanding (MOU) with KazMunaiGas Exploration Production JSC (KMG EP) of Kazakhstan. The MOU allows the parties to explore opportunities to imp...
Output at Iraq's Qurna-2 to Start in Early 2014
Iraq >> 6/26/2013 - Russia's Lukoil will start commercial production of oil at Iraq's West Qurna-2 field in early 2014, Chief Executive Vagit Alekperov said, slightly later than previous indications of a late 2013 start ...
Tethys Announces Long Term Production Test on Block 15
Oman >> 6/24/2013 - The JAS-1 well on Block 15 onshore the Sultanate of Oman has been put on a long term production test. An early production system with facilities has been completed and commissioned. Initial flow rates...
Long Term Production Test Commences on Block 15
Oman >> 6/24/2013 - The JAS-1 well on Block 15 onshore the Sultanate of Oman has been put on a long term production test. An early production system with facilities has been completed and commissioned. Initial flow rates...
Iraq's 2013 Target Within Reach, 2014 to Disappoint
Iraq >> 6/21/2013 - Iraq's oil output target for 2013 is still within reach, even with flows stuck at 3 million barrels a day during the first half of the year, but a lofty goal for 2014 will be far more difficult to mee...
BP Weighs 1m bpd Output Target Cut at Rumaila Field
BP Weighs 1m bpd Output Target Cut at Rumaila Field Iraq >> 6/20/2013 - Oil major BP is weighing cuts of more than 1 million barrels per day in targetted peak output at Iraq's most prolific oilfield, Rumaila, its chief executive said, as Baghdad aims to pump at lower rate...
Iraq Excludes Kurds From 2014 Oil Output Target
Iraq >> 6/18/2013 - Iraq aims to ramp up oil production by nearly 45 percent by the end of next year - without any input from its autonomous Kurdistan region - which suggests a lasting compromise in their long-running oi...
Protests Shut Down Abu Attifel Output
Libya >> 6/15/2013 - Workers at Libya's Abu Attifel oilfield have shut down production in protest over salaries, two industry sources said. The field is operated by Mellitah, a joint venture between Libya's state energy ...
GeoPark Commences Production of Tua 4 Well
Colombia >> 6/13/2013 - GeoPark Holdings Limited ("GeoPark"), the Latin American oil and gas explorer, operator and consolidator with operations and producing properties in Chile, Colombia, Brazil and Argentina, is pleased t...
LGO Announces Production Update in Trinidad
Trinidad and Tobago >> 6/12/2013 - Leni Gas & Oil (LGO) has announced that Group-wide oil production from its operations in Trinidad and Spain now exceeds 400 bopd and on the 10th June 2013 total production was over 450 bopd, a new Gro...
Wintershall's Libya Output Still Below Pre-War Levels
Libya >> 6/7/2013 - BASF-owned oil company Wintershall hasn't been able to raise its Libyan oil production to pre-civil war levels because of lingering infrastructure problems, and protests could continue to disrupt the ...
Petrobras Starts Production at Lula Nordeste Area
Brazil >> 6/6/2013 - Petrobras announces that FPSO Cidade de Paraty went on stream, initiating commercial production at Lula Nordeste area in Santos Basin pre-salt. The new platform is part of the set of production projec...
Eni Set Lower Output Target at Zubair Oilfield
Eni Set Lower Output Target at Zubair Oilfield Iraq >> 5/30/2013 - Baghdad and a group led by Italy's Eni have agreed to cut the planned output target at Iraq's Zubair oilfield to allow this southern giant to pump more for a longer period. ...
NuEnergy Recommences Pilot Production at Muara Enim PSC, Indonesia
Indonesia >> 5/28/2013 - NuEnergy Gas Limited is pleased to announce that the pilot production operations recommenced at the Muara Enim PSC Pilot Production Site in South Sumatra Indonesia on the 25th of May 2013. With comple...

Camp Building Cleaning Equipment, Services Communication Corrosion Products/Services Development Exploration General Labor Services Land & Leasing Mine Clearance Oil & Gas Companies Production Service Companies Skilled Labors Transportation, 4X4 Trucks Utility Systems Water Supply Services Welding Products/Services
For Buyers
For Suppliers
Gulf Oil and Gas
Copyright © 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.