11/16/2021 - We’ve partnered with Hexicon to deliver the ground-breaking TwinWay project in Norway. We’ll deliver the FEED, engineering procurement fabrication (EPF) and installation management of the T... |
11/10/2021 - On behalf of the Wisting licence partners, Equinor has signed a contract with Aker Solutions for front-end engineering and design (FEED) of a floating production and storage vessel (FPSO) for the Wist... |
10/20/2021 - Aker Solutions has received a Letter of Intent (LOI) for a front-end engineering and design (FEED) contract from Equinor, for the FPSO for the Wisting field development in the Norwegian Barents Sea. |
9/15/2021 - Subsea 7 has announced the award of a contract by Aker BP for the front-end engineering and design (FEED) study for the NOA Fulla development project, offshore Norway. NOA Fulla is located in the sout... |
9/15/2021 - Aker Solutions has been awarded two front-end engineering and design (FEED) contracts from Aker BP for the NOA Fulla field development on the Norwegian Continental Shelf. This include the F... |
8/25/2021 - The Norwegian technology company Techouse have been chosen by operator Aker BP to perform the front-end engineering and design extension study for the Sulphate Removal Unit (SRU) for the Valhall IP pl... |
3/23/2021 - Green Minerals AS, a subsidiary of SeaBird Exploration Plc, announces a letter of intent (“LOI”) with a consortium led by Oil States Industries (UK) Ltd to collaborate on a FEED study for a turnkey Ha... |
9/2/2020 - On behalf of the Snøhvit Unit partners, Equinor has awarded Aibel a front-end engineering and design contract (FEED) for modification of the Hammerfest LNG plant in connection with the Snøhvit Future ... |
7/8/2020 - On behalf of the Oseberg partners, Equinor has awarded Aibel a portfolio agreement for the Oseberg fields for the period 2020-2026.
The aim of the portfolio agreement is to ensure a holistic approach... |
5/26/2020 - Saipem has signed a two-year frame agreement with Equinor covering engineering services worldwide. The Frame Agreement encompasses feasibility and conceptual studies, FEED, detailed engineering and re... |
1/15/2020 - On behalf of the Troll partners, Equinor has awarded Aker Solutions a front-end engineering and design contract (FEED) for topside modifications to accommodate power from shore at the Troll B and C pl... |
6/24/2019 - Wood has secured two new contracts from Equinor for onshore and offshore facilities in Norway. The contracts continue Wood’s successful track record of delivering engineering and technical services to... |
2/11/2019 - Kvaerner has signed a contract with Equinor to study how floating concrete substructures for offshore wind turbines to the planned Hywind Tampen project in the North Sea can be designed and constructe... |
12/20/2018 - Var Energi is progressing the redevelopment of the Balder and Ringhorne area, and a FEED contract for the Jotun FPSO life extension has now been signed. In total, about 20 billion NOK will be invested... |
11/18/2018 - Aibel has been awarded the FEED contract for Gudrun Phase 2 Water Injection. The contract with Equinor also includes an option for the actual implementation (EPCI). ... |
4/9/2018 - Wood is delivering front-end engineering design (FEED) for Statoil’s Mongstad refinery near Bergen, Norway, as part of a new contract secured under an existing framework agreement. ... |
11/28/2017 - KBR, Inc. (KBR) announced it has been awarded the Concept and FEED (front-end engineering design) contract by Statoil for their ground-breaking Northern Lights Project, to develop an onshore carbon di... |
11/7/2017 - The Norwegian Government has stated that a Carbon Capture and Storage (CCS) demonstration project shall stimulate necessary development of CCS so that the Norwegian and the EU long-term climate target... |
4/11/2017 - Wood Group has been awarded a contract with Statoil to provide front end engineering design (FEED) to the subsea flowline system of the Snorre Expansion Project in the Norwegian North Sea. The contrac... |
4/4/2017 - ENGIE E&P Norge AS has awarded contracts for front-end engineering and design (FEED) studies for modifications at the Gjoa platform in the North Sea to Kongsberg Maritime AS, Saipem Ltd and Hereema Ma... |