For-energy is able to inspect full range of OCTG (casing and tubing) and accessories. We could provide a wide range of appropriate inspection inventory at any time and any mill in China as per client different requirements. We also provide professional service for line pipe to API 5L specifications, drill pipe, sucker rod, valves and other Oil facilities.
We specialize in the following items:
OCTG
Line pipe
Drill pipe, sucker rod, Fittings, Pipe Coatings
?Structural steel, Jackets, Platforms
Petroleum Equipment
Pressure Vessels, Boilers
Pumps, Compressors
Motors, Switch-gear, Transformers
Wind generator
Valves, Milling tools,Mooring Chain
The scope of the service covers the following:
1. Visual inspection
Visual inspection of the material for quality, workmanship, defects and cleanliness of work.
2. Dimensional checks
Carry out checks to ensure that material is dimensionally in accordance with approved drawings.
3. Compliance with specifications and requirements
processing procedures, processing qualification, coating, marking, material certificates, shop procedures, etc. shall be verified for compliance with specifications, and specific standards.
4. Hand Operation Check
Hand check equipment/tool calibration. Hand gauging and drifting.
5. Witnessing
Witness (non) destructive and chemical testing of materials, mechanical test, heat treatment, hydrostatic test, NDT, etc.
6. Verification of documents
Verify, review and approve all documentation required in the purchase orders such as origin certificate, test certificates, examination reports, tally sheet and packing list, etc.
7. Packing and marking inspection
Check of packing and marking to ensure Compliance with specifications and requirements of clients. Shipping marks and tags check is also included.
8. Photograph materials
Taking high quality digital photographs of materials and every key procedure of material processing to let the clients visual check their materials themselves.
9. Reporting
Submit detailed reports of all services performed and pictures taken during inspection. Inspection activities for each purchase order will be reported separately.
10. Inspection certificate
Issue an inspection certificate immediately after all inspection is completed stating that the equipment or material is in strict accordance with the requirements of the purchase order or rejection announcement.