Profile
Index
Partners
Contact
Information
Account »
Pars Oil and Gas Company (POGC)
Profile
Index
Partners
Contact
Information
Company Profile
Catalog Index
Business Partners
Contact Details
Request Information
News and Articles
Last Gas Compressor of Phases 22-24 Online
First Harbor Operated in Tombak Port
Storage Capacity to Be 1.5M Barrels in South Pars Phase 14
Second SPM Was Successfully Installed In the Region of Pars 2
South Pars Phase 16 Platform Back to Production
Second Pipe-Laying Operation Commences between Kish and Garzeh
Extensive Acidizing Operations Ended on 11 Wells of Phase 14
POGC Announced the Commissioning of Infield Pipeline in of Phase 13
Marine Pipe-Laying Operations Started Between Kish Island & Garzeh Region
The Kish Garzeh Offshore Piping Operation Began
Acidizing Operations Starts on Phase 8’s Wells
Iran Starts Installation of Phase 11 Jacket
The First Jacket Loading in Qeshm Island for South Pars Phase 11
Cargo Ship Carrying SPM Arrives at Assaluyeh in SP19
Iranian Companies Matured in South Pars Projects
Last Deck of South Pars Phase 13 Installed
Last Two Decks Loaded out Simultaneously at SADRA
3rd Platform Starts Up in South Pars Phases 22-24
Last Deck for South Pars Phase 14 Was Loaded Out
First Harbor's Loading Arms Installed in Tombak Port
SP22-24: Two Platforms Sailed Out Simultaneously
First Demercaptanization Unit to Start by March 2020
Third Deck Successfully Installed in SP14
Third Deck of 14 Loaded Out
Gas Recovery Coefficient Increases in SP4 Platform
5 Platforms to Be Operational This Year
Determination of Farzad Gas Field by Next Three Months
South Pars Achievements & Investment Opportunities Introduced in 24th Petroleum Exhibition
South Pars Phases 13, 22 to 24 Inaugurated by President Rouhani
Propane & Butane Production in Phase 13
Work Priorities for New Iranian Calendar Year Explained
Production Chain of Phase 13 Refinery Complete
Second Platform of Phases22-24 Installed
SP22-24; Second Deck Sails out to Location
SP13; Marine Pipelaying Operation Completed
South Pars Plans to Inaugurate by Late February 2019
South Pars Phase13; Refinery Receives Gas from Offshore
SP13; Utilization of Environmental Units
SP13; 56 MCM Sour Gas to be Sweetened
SP 22-24; First Platform Produces Sour Gas
SP22-24;Second Deck Ready for Shipping
South Pars Phase13; Second Deck Installed
SP13 First Deck Installed
Latest Situation in South Pars Development Plan
South Pars Phase13 Connected to 9th Line of Gas Transmission Network
SP20-21; Liquid Gas Reservoirs Exploited
South Pars Phase14; the Second Platform Started Up
South Pars Phase13; Contaminated Amine Treated By Vacuum Distillation
SP13, 22-24; Two Floodcontrol Dams Constructed
SP22-24 Meets 91% Progress
SP9-10: Tip Flares Successfully Replaced
SP Mega-Projects Strengthened POGC's Position
SP13; 3rd Sweetening Train to Be Operational
South Pars Phase 13; 2 Decks Loaded Out at a Time
South Pars Phase13: Marine Pipelaying Operations for Second Line Finalized
South Pars Phase14 Meets 82% Progress
South Pars Phase14; 2nd Platform Successfully Installed
SP Daily Output to Increase 100 MCM
South Pars Moving Along Evolution's Path
SP20&21 Ethane Production Capacity Completed
SP 4 New Platforms to be Loaded from SADRA
SP6-8 Pipeline to 3rd Refinery Exploited
SP Developing Platforms to be Installed Based on Drilling Completion Schedule
SP22-24; Second Platform Ready to be Installed
South Pars Phase 13; Second Sweetening Row Launched
SP22-24; First Platform Installed
SP Flowing Pipelines & Jackets Under Inspection
Farzad B Gas Field Contract to be Signed Soon
More than 93% of Gas Pipeline Constructed
No Message Received from Total to Abandon Phase 11
Offshore Facility Development to be Completed in 2018
23rd International Oil Show Inaugurated
SP14 First Platform; Gas Production Started
Two Key Factors to Achieve Development Objectives in South Pars
Overlapping Executive Operations in Offshore & Onshore Facilities Construction
SP22-24 First Platform Ready to be Installed
SP14 Offshore Package to Complete by Coming Mid-March
CEO Visits Development Plans Progress
SP6-8 Pipeline to 3rd Refinery to Exploit
Platform 24A Flare Tripod Installed
High-Tech in SP Oil Layers Production
SP13 Gas Production Capacity to Meet 50 MCM per day
SP13 refinery: Gas Injection to Grid Started
Tenders for the 11th Phaseto be Finalized Soon
Delivery of 22-24th Phase’s Platform Began
Shahdaei Visited Phase 13th of South Pars
First Deck of SP22-24 Loaded
Two New Platforms Launched in South Pars
The Flare of 14th Phase’s Platform of South Pars Project Kindled
Flare Jackets of 23rd & 24th “A” Platforms of South Pars Project are Ready for Installation
1st Sweetening Facility of SP Phases 22-24 Ready to Operate
Total Resolved to Continue Development of SP Phase 14
First SP14 Platform Successfully Installed
SP Power Plant: Power Production over 17 million MWh
LPG Export Dock to be Utilized by Next Year
Maintaining Production, POGC Priority for Winter
SP Refineries Ready for Winter
Research Role in South Pars Sustainable Development
South Pars Phase13; LP Flare Lit
Low Pressure Flair of South Pars 13th Phase Launched
SP13 First Boiler Operated
SP Gas Output Hit 85b Cubic Metres in H1
Three-Stage Targeting in South Pars Development Plan
South Pars Development Process Reaches 85%
Iran, Italy Sign MOU; SP12 Flare Gas to Turn to Electricity
POGC in Netherland Offshore Exhibition
SP13 Development Plan; Pipeline Operations Finalized in First Line
POGC Starts Construction of Mechanized Sulfur Storage Warehouses in Tombak
SP2&3 Starts Constructing First Condensate Sweetening Unit
SP Condensate Facility; Piping Operations Reaches 64% of Progress
SP13; Offshore Pipeline Passes Through Half
The Contract Details for Development SP 11’s Offshore Facilities
Contract Signing for Offshore Phase 11 South Pars Development Plan
Monday's Signing Marked total with the International Investment Security Return to Iran
Phase 13’s Refinery Connected to Grid
13A’s Replacement Jacket Hit 65% of Progress
Geotechnical Operation of Tombak Service & Export Port Comes to End
Overhaul Ends in Phase 1’s Platform
Pipe-Laying Operations Finishes in SP14A Platform
20% Growth of Labor Productivity in Pars Oil and Gas Company
More than 4 million Barrel of SP 20&21 Gas Condensate Exported
Integrated Management Results in South Pars Fruition
22nd Gas, Oil, Refining and Petrochemical International Fair Opened
POGC’s Expert Panel on Condensate Tanks Management
The 3rd Sweetening Train of Phases 20&21 Starts
6 More Platforms of South Pars to Start Operating by March 2018
Loading Last Platform of Phase 19 from Khorramshahr Industrial Yards
Daily Gas Production to Reach More than 500 mcm by the End of February 2017
Daily Gas Production to Reach More than 500 mcm by the End of February 2017
South Pars Phase 19 Propane & Butane Production Started
Iran Reachs Qatar in South Pars Gas Production
South Pars Phase 22 Tripod & Deck Installed
Last Platform of South Pars Phases 17 & 18 Installed
South Pars Phase 13 First Tripod & Deck Installed
Phase 19 Gas Extraction from South Pars Field Reach 42 mcm
Phases 20 & 21 Second Row of Sweetening Ready for Gas
Denmark Ambassador Astonished by South Pars Progress
South Pars Phase 21 Platform Loaded
South Pars Phase 20 Deck Reach Last Station
Farzad B Economic Development Model to Finalize
South Pars Phase 20 Platform to be Installed on Persian Gulf Waters
South Pars Phase 20 Platform Loaded
South Pars Platform 20 to Load This Week
South Pars 17B Platform Loaded
South Pars Last Platforms of 17 & 18 Phases to Load in Near Future
South Pars Refineries to Upgrade HSE
New South Pars Platform on Way for Installation
Gas Condensates Export Started from Phase 19
Call for International Tender
SP Phases 20, 21 Gas Sweetening Starts September 2016
Iran Unveils its First Home Built Cryogenic Pump
SP Gas Condensate Output Jumps 15%
Iran & India Agree to Develop Farzad B
SP Phase 19 to Produce 1bcf Gas by Mid-May 2016
Phase 19 Gas Recovery Commences
South Pars Ethane Feedstock to Rise After Compressor Installation
South Pars Phases 20, 21 Refinery Online
Phases 20, 21 of SP Field to Come on Stream Next Summer
South Pars Gas Condensate Reservoir Ready for Export
Six South Pars Phases to Become Operational by June 2016
President Rouhani Launches South Pars Gas Field Phases 15 & 16
South Pars Oil &Gas Fields Development to Complete by March 2018
GECF Ministers Re-Elect Adeli as Secretary General
Iran Elected GECF Alternate President
South Pars Phase 17 Starts Pumping Gas
Gas from South Pars Platform 19C Online by Winter
GECF Extraordinary Ministerial Meeting Opens in Tehran
Phase 19 Sweet Gas En Route for Winter 2015/2016
Total Sweet Gas Recovery from Phase 12 at 12bcm
Plants Being Fed by Ethane from Phases15&16
Iran to Introduce 3 Gas Fields for Investment in London Conference
13 Refinery Units Launched Under Rouhani Admin
POGC Eyes 1st Phase 19 Refinery Train by Winter
Phases 15&16 of South Pars Nearly Ready
Drilling on the Go at Phase 24
Platform 12B of South Pars Nearly Complete
Phase 19 Gas Expected in Winter
Phase 13 Platforms Over 70% Ready
Phases 17&18 Development 89% Complete
South Pars Oil Layer Nearly Ready for Pre-Startup
POGC Starts Phase 20&21 Pipelay
Phases 22 to 24 Cross 77% Progress
Phase 13 Drilling to Speed Up
No Deaths as Singapore Vessel Hits South Pars Jacket
Revenues from Buy-Backs Lower Than Iran Potentials
Iran and Oman Sign Gas MoU
Marine-1 Drilling Rig to Start Operations in SP Phase 20
Largest SP Gas Field Jacket Installed
Iran to Triple Gas Condensate Exports in Two Years
POGC Signs 6 Deals with Iranian Companies
Iran Gets $25b from Gas Exports
South Pars Installations are Safe After Quake
Iran to Add 150 mcmpd Gas to Current Capacity in 2013
Iran to launch South Pars phases 12, 15, 16
Iran, Pakistan Inaugurate IP Gas Pipeline
South Pars Phase 20 Jacket Installed
First Offshore Operations of South Pars Phase 19 Completed
Iran Enhances South Pars Gas Production by 20%
NIGC Processes 136 bcm of Gas
Extension of IP Pipeline Starting in 30 Days
NIOC Expanding Exploratory Activities
Iran’s Petrochemical Exports Hit $7 Billion
Iran to Increase Gas Production in South Pars Field
Iran Start Drilling 1St Development Well at SP 22-24
CBI Allocates $10 Billion to Iran Upstream Projects
Pipe Laying Completed in S Pars Offshore Phase-19
POGC Completes Setting up First Deck Of SP’ Phases 17-18
Onshore Units of SP Phases 22-24 Coming Online
Phase 12 of Iran South Pars 82% Complete
South Pars Supplying Almost Half of Iran's Gas Needs
South Pars Phase 14 Third Jacket Heads for Persian Gulf
Iran to Supply Gas to Iraq by Mid-2013
South Pars Phases 17 & 18 Come on Stream This Winter
In Less Than a Year Iran’s Gas Reaching Pakistan Border
Installation of SP Phases 17&18 Platforms to Be Realized in 3 Months
Installation of Floor Structures Starts in SP Phase 14 Platforms
Construction of 2 Barges for Carrying Offshore Platforms in Bushehr
SP Phase 19 2nd Jacket Installed in Persian Gulf Waters
Iran’s Largest Gas Phase In Persian Gulf Witness 80% Progress
Iran Starts Drilling in Largest Joint Oil Field with Qatar
Iran to Export Gas to Europe Via Turkey
NDF to Allocate $5 Billion to South Pars Phases 20-24
Progress in Iran SP Phase 14 hits 40%
A Tender to Be Held for Purchasing South Pars Sea Pipelines
Iran Sets Deadline for China's CNPC to Start South Pars
Iranian Companies Successfully Replace International in South Pars
Marine-1 Drilling Rigs Starting Operations in SP Gas Field
ISOICO Commissions 2,000-ton Platform Jacket in SP Phase 14
South Pars Phase 19 Offshore Structures to Be Installed
Iran to Build Middle East’s First Underground Gas Storage
Steam Production Unit of Phases 15 & 16 Comes on Stream
Iran Signs South Pars Drilling Deal
Iran Outperforms Foreign Firms in South Pars
Five South Pars Phases to Start Early Production Next Year
South Pars Phases 17-18 Will Be Operational
Integrating SP Gas Processing Plants to Start Soon
New Drilling Starts at SP Phases 17 and 18
Iran-Pakistan Pipeline Will Be Completed in 3 Years
Selecting Contractors of Two Packages of SP Phase 14
Ferdowsi Field Holds a 34 Billion Barrels Oil Layer
South Pars Phases 27 & 28 Contract to Sign Next Week
South Pars 46 BCM Refined Gas was Produced
South Pars Oil Layer Development Project Jacket is Launched
Iran’s SP phases 1-5 export over 234m barrels of condensates
NIDC to Finalize Drilling Contract of South Pars Phases 9, 10 Soon
East Mediterranean
Zohr: A New Game Changer
The Fall of the Energy Corridor
Reversing the Flow
Who is Fighting over Egypt's Gas?
Egypt Gas Export Infrastructure
COVID-19
Unconventionals
Shale Gas
Oil Shale
Tight Gas
Oil Sands
Coalbed Methane
Projects
Saudi Arabia
Qatar
Kuwait
UAE
Iran
Tenders
Finance and Investing
Pavilions
National Oil Companies
Unconventional Players
2G Products
China Equipment
Alternative Energy
Geophysical Services
PRODUCTS
News
Casings and Tubings
Handling Tools
Drilling and Well Services
Petrochemicals
JOBS
Membership Services
Business Cloud
Advertising
Competitive Intelligence
Plant Database
Talent Solutions
About
Contact Us