Reference | GT10107900 |
Date | 8/9/2010 |
Location | Middle East |
Scope | EPIC of covered storage buildings and miscellaneous civil works within Dukhan Fields include the following: 1- Covered Storage Building at PWI-1 Station. 2- Covered Storage Building at Fahahil North Gas Lift Compressor Station (FNGLCS). 3- North Field Injection Station (NFIS) as follows: a- Provision of interlocking tiles paving at pigging area. b- Provision of reinforced concrete impact wall at pigging area. c- Provision of a roof shed at new lay down area. d- Provision of new assembly points no. 1 and 2. |
Bid Bond | QAR 400,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QAR 500.00 |