Scope
Carry out Foundations modification works to strengthen the following static tall structures in Qalhat plant as per the wind speed assessment and as required for code compliance to revised wind speed of 55 meters/ second.

1- 100M Vapour Flare Stacks A-6206
2- 260M Liquid Flare Stacks A-6212
3- HTF Furnace/ Heaters 1/2/3-F4101
4- Pipe Rack PR1 in Unit 6200
5- Pipe Rack PR2 in Unit 6200

Contractor will be supplied with Detail design packages for all above modifications to the existing foundations and the scope is limited to construction only.

Bidding Information

Engineering Services
Related Prooducts: Engineering Services Consultancy Engineering FEED General Maintenance and Repair Process Technology Licensing Production Engineering Project & Resource Management
Related Tenders: Consultancy Engineering FEED General Maintenance and Repair Process Technology Licensing Production Engineering Project & Resource Management

Related Articles

For Buyers
For Suppliers
Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.