Supply of Cooling Tower

Cooling Towers
Reference 15/2012/E/NR
Date 3/26/2012
Location Middle East
Scope
Supply of cooling tower for asphalt unit / THI-QAR refinery
Asphalt unit THI-QAR Refinery request package two cells cooling tower of specification as below:
Circulation water capacity 500m/hr
Relative humidity 30%-60%
Difference between inlet & outlet temp. 13C
Wet bulb temp. 28C
Drift Losses 0.1% of circulation capacity
Evaporation Losses 1.9% of circulation capacity
No. of cells 2, capacity of each Is 250 m /hr
Ambient temp. 55C(Max.) & -6.5C(Min.)

The structure should be c/s coated with resistant material of chemicals or galvanized steel.
All pipes and interconnections should be c/s
All hydraulic connections, considering the battery limit water inlet and outlet flanges
Civil engineering, mechanical engineering and electrical engineering included
Three main pumps, two in operation & the third stand by, the capacity of each is 250 m/hr, Head 70m.
Two pumps for make up, one in duty & the other is stand by.
Skid for chemical dosing pumps supplied with dosing tanks sufficient for 24 working hours, two pumps for each material, one in duty & the other is stand by.

Bidding Information

Documents Price USD 100.00
Cooling Towers
Related Prooducts: Cooling Towers Adsorption Equipment & Materials Aerators Agitators & Mixers Air Conditioning & Refrigeration Bailers, Sand Blowers Boilers Clarifiers Condensers Cooling Towers Dryers, Drying Machinery & Equipment Emulsifiers Furnaces General Heat exchangers Mixers, Static Nozzles/Diffusers Steam Generators Ventilators
Related Tenders: Agitators & Mixers Air Conditioning & Refrigeration Bailers, Sand Blowers Boilers Cooling Towers Dryers, Drying Machinery & Equipment Emulsifiers Furnaces General Heat exchangers Steam Generators

Related Articles

For Buyers
For Suppliers
Gulf Oil and Gas
Copyright 2021 Universal Solutions All rights reserved. - Terms of Service - Privacy Policy.