Design & Supply of Re-Boiler Vent Gas Recovery (RVR) Package Units

Boilers
Reference TP-607-2020
Date 6/28/2020
Location Middle East
Scope
The company announces its need for Design & Supply of Re-Boiler Vent Gas Recovery (RVR) Package Units. At present; hydrocarbon gas is being cold vented continuously from still vents of Gas Dehydration Units (GDUs) via open cold sumps. The company is receiving regular complaints of bad odour from GDUs K09, K19 and K32 as these GDUs are located near residential areas. The company initiated a project to install small Re-boiler Vent Recovery (RVR) Units at these locations to recover the vent and stop the bad odour. Additionally The company will install a big RVR unit at the recently installed 500 MMSCFD Central.


Bidding Information

Bond Validity 180 days
Documents Price BD 100.00
Boilers
Related Prooducts: Boilers Adsorption Equipment & Materials Aerators Agitators & Mixers Air Conditioning & Refrigeration Bailers, Sand Blowers Boilers Clarifiers Condensers Cooling Towers Dryers, Drying Machinery & Equipment Emulsifiers Furnaces General Heat exchangers Mixers, Static Nozzles/Diffusers Steam Generators Ventilators
Related Tenders: Agitators & Mixers Air Conditioning & Refrigeration Bailers, Sand Blowers Boilers Cooling Towers Dryers, Drying Machinery & Equipment Emulsifiers Furnaces General Heat exchangers Steam Generators

Related Articles

For Buyers
For Suppliers
Gulf Oil and Gas
Copyright © 2023 ICT All rights reserved. - Terms of Service - Privacy Policy.